Institutional Design Projects - Department of Education (DepEd)
Institutional Design Projects: Department of Education (DepEd)
Proposed Architectural Design & 3D Visualization of DepEd Projects
Client: Department of Education (DepEd)
Design Finalized: October 2019 to July 2022
In collaboration with the Department of Education (DepEd) from October 2019 to July 2022, ARKOSENYO undertook a comprehensive Institutional Design Project encompassing architectural design and 3D visualization for various critical DepEd initiatives. This project exemplified our commitment to shaping a positive future for Philippine education through innovative and functional designs.
The project encompassed diverse initiatives, each addressing specific needs within the DepEd system. The Don Mariano Elementary School envisioned a modern, well-equipped learning environment. The renovation of Gabaldon schools aimed to revitalize existing structures while preserving their historical significance and meeting modern educational standards. Recognizing the importance of parental involvement, the Parent’s Hub proposal envisioned dedicated spaces within schools to foster communication and engagement between parents, teachers, and the school community. Finally, the DepEd Access Building proposal championed accessibility by designing an inclusive central office building.
Through detailed architectural designs and 3D visualizations, the project aimed to enhance the learning experience through well-designed spaces, optimize resource utilization during construction, promote inclusivity through accessible features, and preserve historical heritage in the Gabaldon school renovations. This multifaceted project served as a testament to ARKOSENYO‘s dedication to supporting DepEd’s mission of providing quality education for all Filipinos, aiming to create inspiring, inclusive, and culturally reflective educational spaces through a combination of architectural expertise and technological innovation.
ARKOSENYO completed the design proposals from October 2019 to July 2022.
Disclaimer: The final design may be subject to adjustments during construction due to material availability or client requests.